Who verifies the device's condition after delivery?

Long-term risks in stage machinery often emerge after delivery. The service process clearly defines deliverables and responsible parties for each phase, ensuring traceability for ongoing operations.

PROCESS / 07

Schedule a technical discussion
Workflow

From requirements gathering to scheduled maintenance

  1. 01

    Requirement Communication

    Responsible Party:Project Onboarding
    Deliverables

    Use Cases, Performance Types, and Renovation Requirements List

    Cooperation Items

    The theater provides stage opening dimensions, stage floor plans, and existing equipment documentation.

  2. 02

    Solution Design

    Responsible Party:Technical Design
    Deliverables

    Equipment Selection Specifications, Floor Plans and Cross-Sections, Control Architecture

    Cooperation Items

    Align interface conditions with architectural, structural, and fire protection disciplines.

  3. 03

    Manufacturing

    Responsible Party:Manufacturing Assembly
    Deliverables

    Structural Components, Drive Units, and Control Cabinets

    Cooperation Items

    Manufacture according to drawings; maintain inspection records for critical processes.

  4. 04

    Install

    Responsible Party:On-site construction
    Deliverables

    On-Site Installation and Structural Verification Record

    Cooperation Items

    The theater provides construction windows and venue conditions.

  5. 05

    Debugging and Acceptance

    Responsible Party:On-site construction
    Deliverables

    No-load and load test records, interlock tests, and acceptance documentation

    Cooperation Items

    The using unit, supervisor, and relevant professionals shall participate jointly.

  6. 06

    Training Delivery

    Responsible Party:After-sales Operations & Maintenance
    Deliverables

    Operation Manual, Maintenance Guidelines, and Training Records

    Cooperation Items

    Operators and maintenance personnel attend training.

  7. 07

    Scheduled Maintenance

    Responsible Party:After-sales Operations & Maintenance
    Deliverables

    Inspection Records, Wear Part Replacement Recommendations

    Cooperation Items

    Schedule downtime for inspection according to the agreed cycle

After Sales

The service cannot end on the delivery date while the device is in use.

A1

Response mechanism

After receiving a repair request, first assess the issue remotely. Dispatch personnel as scheduled if on-site support is needed; prioritize projects with high risk of performance cancellation.

A2

Spare Parts Support

Maintain a spare parts list for consumables and critical electrical components; provide replacement intervals and stock recommendations upon delivery.

A3

Inspection Plan

Set inspection intervals based on usage frequency. Check brakes, limit switches, wire ropes, and electrical circuits, then document the results in writing.

A4

Operation Training

Complete handover phase operations and routine inspection training; provide refresher training after personnel changes.

Response Range

Remote diagnosis follows repair requests; on-site personnel are dispatched per contract timelines. High risk-of-show-stoppages projects are prioritized. Specific response times follow service agreements.

FAQ / Frequently Asked Questions

Things to know before we chat

What documents are required to start a renovation project?

Please provide the theater floor plans, sections, stage opening dimensions, clear height of the stage well, existing equipment list, and records of current issues. If documentation is incomplete, we can schedule an on-site survey for our technical team to take additional measurements.

Can equipment specifications be customized based on existing models?

Confirmed. Table dimensions, travel range, load capacity, and drive configuration are determined based on the site measurements and structural verification results. The classifications shown on this page indicate structural orientation only and should not be treated as fixed specifications.

Can the theater continue to operate normally during construction?

Construction can be phased based on project visibility. For renovation projects, performance schedules are typically confirmed with the theater during the planning phase to schedule noisy tasks and those affecting the stage during non-performance windows.

Can the control system integrate with existing equipment?

Verify the driver type, signal interface, and safety circuit of the original equipment. Some legacy devices can be integrated by adding sensor and interface modules; final feasibility is subject to on-site assessment.